Neil Moss

Industry expert

 Neil Moss

Neil Moss

London Underground , principal tunnel engineer

Neil Moss is a Chartered Civil Engineer and has been involved in tunnelling projects since 1989. After an eye opening six week spell at the Channel Tunnel he worked on sewage balancing tunnels in Ramsgate until the Jubilee Line Extension came along. Neil then spent two years working on designs for Southwark Station before going on site to C102 Westminster on secondment to Balfour Beatty AMEC. On site Neil gained valuable experience in all of the tunnelling methods required to build underground infrastructure in London. After this he became responsible for the design of the tunnels on the Singapore MRT Northeast and Singapore Deep Tunnel Sewerage scheme. In 2001 he returned to the UK and joined Channel Tunnel Rail Link, supervising the tunnelling beneath London Underground assets. After CTRL Neil then worked with Arup on King’s Cross Redevelopment before joining TfL. Initially working on Crossrail and then moving to London Underground where Neil is currently Principal Tunnel Engineer for the Northern Line Extension to Battersea.

By continuing to use the site you agree to our cookies policy. Accept